|
|
|
The North Sliding Glass Wall
|
|
|
|
|
|
These Wedge Sockets Terminate The Closing Ropes At The Peak of The Roof. 285 Feet up! |
|
|
|
One of 10 Carrier Assemblies That Our Wire Rope Spools On To Close The Roof. |
|
|
|
|
Standing In Front Of The Carrier Looking To The Peak. |
|
|
|
The View Looking South. |
|
|
|
The Downtown Towers To The North. |
|
|
|
Ok, We Are At The Highest Point (below the lightening rods).
Looking West Across The Roof at Diamond Chain. |
|
|
|
Alberici Constructors is Using Tway Slings For A Major Structural Member Lift. |
|
|
|
|
Sofco Erectors Installs A Precast Panel With Our Rolling Blocks And Slings. |
|
|
|
Our galvanized wire rope is spooling properly on one of the carrier drums that hauls the roof up hill. |
|
|
|
Thursday April 24th. Closing the East Roof Panel (2.7 million pounds) |
|
|
|
These are the VFD, computer controlled motor drums that spool up the wire ropes. |
|
|
|
While standing on the peak looking east at the Indy skyline. |
|
|
|
|
Daybreak Summer 07
|
|
|
|
Yes, from up here that really is Marlin's crane.
|
|
|